Georgia is where I live, so I wanted to look at it more closely than a fifty-state ranking allows. This sets the project's score for Georgia against the state's figures from the EIA and a couple of other open sources.
Where Georgia sits in the index
On the real data Georgia sits in the middle of the table, and no single part of the score stands out as its problem. An earlier draft, on the sample, had it near the top.
An earlier version of this page had Georgia second. That was the sample. With the real EIA-861 outage figures and real plant capacity from eGRID it comes out nineteenth, and 343 minutes off supply is close to the national middle.
Nothing about Georgia is extreme on this measure. Its 343 outage minutes are middling, and gas, nuclear, coal, solar, biomass and hydro all contribute, so it is nowhere near the concentrated supplies that put Mississippi and West Virginia at the top. What edges it up is the spare-capacity part, which still runs on sample peak demand.
The real numbers
These come from the EIA's Georgia electricity profile for 2024, so they are real figures rather than the sample.
8th in the US
7th in the US
EIA 2024
26th in the US
5th in the US
the rest is IPPs and CHP
Georgia both makes and uses a great deal of power. It sells more electricity than all but four states, while the price people actually pay stays fairly ordinary.
Where the power comes from
Share of generation by fuel, from EPA's eGRID for 2023. That is a different source from the EIA totals above. Gas does most of the work and nuclear is a clear second, while coal keeps slipping as solar climbs.
Source: EPA eGRID2023, Georgia plant records.
The big plants
A lot of Georgia's power comes from a handful of very big stations, which is the sort of thing the concentration part of the score is meant to catch. Two of them matter nationally: Bowen is the second largest coal plant in the United States, and Vogtle is among the largest nuclear stations. The five largest in the state, from eGRID:
| Plant | Fuel | Capacity | Generation | CO2 |
|---|---|---|---|---|
| Vogtle | nuclear | 3,544 MW | 23.0 TWh | none |
| Bowen | coal | 3,499 MW | 10.2 TWh | 11.2M t |
| McDonough | gas | 2,848 MW | 17.8 TWh | 7.1M t |
| Scherer | coal | 2,673 MW | 6.5 TWh | 8.3M t |
| Hatch | nuclear | 1,848 MW | 14.3 TWh | none |
Source: EPA eGRID2023. Generation in terawatt-hours; CO2 in millions of tons a year.
Plant Vogtle (nuclear)
Vogtle's two new reactors, Units 3 and 4, started up in 2023 and 2024, the first newly built US reactors in a generation. The number above is for 2023, before Unit 4 was running, and with Unit 4 Vogtle is past Palo Verde in Arizona, which the 2023 data still has as the largest in the country at 4,210 MW. All that steady, low-carbon output helps on the spare-capacity side of the score, but it also means a lot now rides on one site.
Plant Scherer (coal)
Scherer, near Juliette, is the seventh largest coal plant in the country out of 222. At 8.3 million tons of CO2 in 2023 it was the twenty-second biggest single emitter of any US power plant. Coal is a shrinking part of Georgia's power now, but a plant this size still counts, both for emissions and for how much sits on one asset.
Most of the state buys from Georgia Power, part of Southern Company, with the rest covered by a big set of electric membership co-ops and city-owned systems.
Where the plants are
Every Georgia plant of 50 MW or more from eGRID, placed roughly where it sits. Size is capacity, colour is the fuel, and you can hover a dot for its name and size. The handful of big dots are where most of the power actually comes from.
Hover or tap a plant to see what it is.
Source: EPA eGRID2023, plants of 50 MW and up. Click a fuel to show or hide it, and hover a dot for details.
The storms behind the outages
Outages are not what drives Georgia's score, but they are still the part most people would recognise. NOAA's Storm Events Database logs the severe weather that brings lines down. Georgia gets a great deal of it: hurricanes and tropical storms from the Gulf and the Atlantic, summer thunderstorms, and the occasional ice storm.
The clearest recent example is Hurricane Helene in September 2024. It tracked inland across Georgia and knocked out power to well over a million customers, one of the worst outage events the state has had. That is the sort of thing the SAIDI and SAIFI numbers are averaging out, and for Georgia the exposure here is really about the weather rather than its plants.
What it means for resilience
Put the two halves together and Georgia comes out unremarkable, well below where the sample had it. Its outage minutes are middling for a storm-prone Southeast, and its fuel mix is one of the broader ones in the country, so concentration is not its problem the way it is for Mississippi or West Virginia. The nuclear at Vogtle adds a big block of firm capacity on top of that.
What nudges Georgia up is the spare-capacity part of the score, and that part still runs on sample peak demand. Real state peak demand would show whether the margin is actually tight or an artefact of the sample. The other gap is the wires. None of this says anything about the transmission network, and for a state that loses power mostly to storms that is probably where the answer is.
Two kinds of number are mixed here on purpose, and kept apart. The rank and score come from this project's index. The outage input is real EIA-861 data for 2023 and the plant capacity is real EPA eGRID data, while peak demand is still a sample figure. The generation, capacity, price and plant figures in the sections above are real throughout, from the EIA, EPA eGRID and NOAA.